MOTOR YACHT – 83 METERS

  1. A new raw/fresh water line was made, approximately 15 meters long, with an IN pressure system, with its corresponding valves, made of stainless steel and connections.
  • Installation of a 20-litre stainless steel heater with shut-off valves.

  • Installation of an outdoor shower box, with column and shower head.

  1. Installation of Quooker equipment (water softener: cold/hot, raw and carbonated water).
  • Installation of the corresponding multifunctional taps and activated carbon filters.
  1. Installing the ice maker:
  • Installation of a new 15D stainless steel tube (pressure) with activated carbon filters.