SAILING YACHT – 67 METERS
For the S/Y Vertigo, we carried out work, over a period of three months, at the Navantia shipyard, in Cartagena, Spain.
The work consisted of:
Cleaning the drains (hatches on deck):
- This work consisted of cleaning the drains on the deck and hull, of different diameters.
- An inspection was carried out using special webcams, followed by the corresponding cleaning of the 206 deck drains.
- The drains mentioned were cleaned with a special descaling product and pressurized water.
Hot water circulation system:
- In this work, a new collector was manufactured in 32 mm and 25 mm diameter PPR pipe, and 16 mm multilayer, with the replacement of 2 mixing valves, 10 1'' valves, 2 3/4'' valves, 3 check valves and several links.
- In addition, the necessary adapters with 3 connecting pieces were placed, concluding with the insulation and manufacturing of the pipes.
- In addition, in the three main fresh water pumps, an existing pipe was replaced with a rigid and hard one, with its corresponding pressure gauge, valves and connections.
Finally, the final adjustments and checks of all the work were carried out to ensure its correct operation.